The plant is about 3/4 mile south of the Maryland line. 2 Siemens SGT6-PAC 5000F CTGs and 1 SST6-PAC5000 STG, 2 Vogt HRSGs, a mechanical draft cooling tower, water and wastewater treatment systems, and related balance of plant and auxiliary equipment. This is a simple cycle facility owned by the ENMAX Energy Group and operating in Alberta, Canada. TRI Facility Name: BRAZOS ELECTRIC JOHNSON COUNTY GENERATION FACILITY: Address: 831 SPARKS DR, CLEBURNE TEXAS 76033 (JOHNSON) (Map by Google, Yahoo) County: JOHNSON: Public Contact: J.B.DOMINGUEZ: Phone Number: 254-750-6235 : Public email: JDOMINGUEZ@BRAZOSELECTRIC.COM : Forms Submitted to TRI in 2018 Reporting Year: Form R (regular form): 1 . Olsson Industrial Electric was awarded the project to replace substations at the Dalles Dam. Commercial operations expected to commence late 2019. The phase consists of 1 steam turbine with 300MW nameplate capacity. The first step was to create logic in the plant DCS to capture chiller operational data during the different plant operating scenarios through the summer peak season to help guide engineers. Address 831 Sparks Drive Cleburne , Texas , 76033 Website brazoselectric.com Johnson County Details Facility Type Natural Gas Fired Combined Cycle NAICS Description Fossil Fuel Electric Power Generation Operator Brazos Electric Power Coop Inc Operator ID 2172 Operating Capacity (MW) 282.6 Summer Capacity (MW) 267 Winter Capacity (MW) 278 E3 provides construction and monitoring services after being retained for a due diligence review focused on technical and environmental aspects of this project consisting of two Mitsubishi Hitachi Power Systems Americas 501J CTGs, two Nooter/Eriksen HRSGs, one Siemens SST6-5000 STG. The Facility is a 21 CCGT, (2) 296MW Siemens SGT6 8000H Combustion Turbine Generators with CMI Duct-Fired Heat Recovery Steam Generators and a 358MW SST-5000 Steam Turbine Generator, producing 950 MWs. Jack County Generation Plant (Jack County Generation Plant Block I) is equipped with GE Power 7F.04 gas turbines. NAES also operates out of the Gridforce office. While the chiller enabled operators to increase summertime power production and gave dispatchers a predictable output for dispatch, its operation increased station auxiliary load. [8] The court would rule that the legislature had the ability to exempt such generators and upheld the tax exemption and that the commission had in fact abused its discretion. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector. Holland is owned by Hoosier Energy Rural Electric and Wabash Valley Power. It is arranged in two 11 units consisting of one class 7FA.05 combustion turbine generator, one heat recovery steam generator (HRSG) and one steam turbine generator (Unit). CAISO Generator Modeling Process and Data Requirements, PERSONNEL PERFORMANCE, TRAINING AND QUALIFICATIONS, MODELING, DATA, AND ANALYSIS (MOD) STANDARDS. 34 individual units installed at 6 sites located in Ohio and Indiana include 19 CTGs units, 14 diesel generator units, and one PV solar unit. NAES has developed specific protection system training materials suitable for compliance with the Standard and provides this training both on and off site. [citation needed], In 1967, Brazos sent general manager H. A. Dalton to appear before the 90th United States Congress to give testimony on introduced amendments to the Federal Power Act which were seeking to ensure electrical power service throughout the nation in the event of an emergency. While additional requirements have been placed on larger NERC registered facilities, these changes may pose an even greater burden to entities that have been exempt from NERC mandated modeling and protection requirements. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you. [citation needed] Brazos also began purchasing energy from Duke Energy's Lapetus Solar project in Andrews County, Texas via a power purchase agreement in January 2020. The tool not only eliminates 95% of all physical demands, it has eliminated 95% of the safety hazards of sprains and strains associated with pushing or slipping on the wet floor. Sells steam to an adjacent plastics manufacturing facility pursuant to a steam sales agreement. Owned by Brazos Electric Cooperative Inc. Offers 268 MWs - 1 S-W Frame 501FC. Excess electric power is sold to the local utility (NY State Electric and Gas Corporation). PRC-026 requires applicable entities to perform load responsive relay settings analyses based on criteria identified within the Standard. PRC-001 requires entities to coordinate protection system changes with other affected parties. Owned by Arroyo Energy Investors, Brandywine offers 230 MW 2 GE 7EADLN-1gas turbine generators with 1 GE Steam Turbine, 2 Nooter Eriksen HRSGs. Jack County 1 & 2 1,205 MW Ownership CC 2006 - 2010 Johnson County 265 MW Ownership CC 1997 R.W. Miller 4 & 5 206 MW . Another cost to consider: Recharging of the thermal storage tank incorporated into the design of the chiller system. BRAZOS ELECTRIC JOHNSON COUNTY GENERATION FACILITY EIA-860 - 54817. Hazleton has 4 simple cycle natural gas turbines and uses 3 GE LM5000 turbines and 1 Alstom 11D5. Plant with 3 LM6000 PF, Simple Cycle gas natural fired, 90MW capacity, Air cooled by chillers. Offers 25 MWs 1 Westinghouse 301G, Owned by Midwest Energy. Also has low sulfur fuel oil backup capability. Denotes the facility Representative Point (best pick) location . Section 10 of the BPM establishes revised data requirements and compliance procedures for all participating generators including non-NERC registered entities. Olsson was awarded this project to replace and dispose of two 3.75MVA, 13.8kV-4160V Station Service Transformers and fire doors; to rewire 4 XP Breaker Cubicles and to design and install XP Breaker Interlocks and water cooling system. NAES performs all required studies to establish compliance. and Reactive Power capability testing for individual generating units over 20 . NAES can complete protection settings analyses and provide compliance documentation that clearly identifies protection settings as they relate to NERCs no trip zones. One of six facilities that make up the Calpeak project consisting oftwo LM6000 PC Sprint units with a combined output of 96MW. Over time, the cooling capability of the storage tank would be drainedlike a battery in a flashlight left on. Jackfish is Devons steam-assisted gravity drainage (SAGD) plant located in Albertas boreal forest. The plant has ~6,600 Btu/kWh heat rate-one of the most efficient units in the country. Offers 2 MWs- Roll Royce Trent 50, Owned by WW Human Resources Limited. This was called the tank-only mode of operation (Fig 6). Results. The Facility, owned by Tenaska, is located in Maryville, MO. Facility with a Foster Wheeler Boiler and a GEC-Alstom Steam Turbine. NAES utilizes predefined calculation options as well as simulations to determine a facilitys compliance status and development of new relay settings if required. One of two facilities that make up the Dover Plant, VanSant Generating Station built in 1991 uses GE Frame 6B oil and gas to produce 40 MV. Owned by Foristar North Tonawanda Inc. Offers 59 MWs 1 GE Frame 6B. 300 Abner Jackson Parkway, Lake Jackson, TX 77566 Phone: 979-285-2501 Fax: 979-285-2505 Email: chamber@brazosportchamber.org . TRI Explorer is using the National Analysis data set (released to the public in October 2022). Combined Heat and Power (CHP) facility is a cooperative housing community in New York City with approximately 60,000 residents, including 35 high rise apartment buildings, 8 town house clusters, 3 shopping centers, and 8 parking garages on a 330-acre site. Owned by CA State University Channel Islands Site Authority, CI Camarillo offers 26.75 MWs with 1 GE LM2500PE. Johnson County residents Korey Connally, Eli Booth and Katelyn Hawkes as recipients of NAES Corporation scholarships. 1 Deltak HRSG with supplementary duct firing and a General Electric Steam Turbine Generator exhausting to a water-cooled surface condenser. Another cost to consider: Recharging of the thermal storage tank incorporated into the design of the chiller system. Astoria Energy is a 575 MW (with duct burners) 21 GE 7FAcombined-cyclegas turbine power plant with an Alstom steam turbine, locatedin NW Queens County on the East River. Copyright 2023 NAES. PurEnergy provides asset management and financial services to the project. generation company, Brazos Electric Cooperativ . Millennium Power commenced commercial operationin the year 2000 in Charlton,Massachusetts. [7] In the case, the TCEQ claimed that heat recovery steam generators (HRSGs), devices the Texas Legislature considers "pollution control property," should not be exempt from the previously mentioned tax and that the legislature did not have the ability to give said exemption. Southampton Power Station is a 51 Net MW biomass unit located near Franklin, VA, built in 1992 and consisting of two B&W stoker-fired boilers and a Mitsubishi turbine/Alsthom generator set. The challenge was to optimize chiller operation for summer peak periods.Brazos Electric Cooperative Incs Johnson County Generation Facility, operated by NAES Corp, recently installed a 3500-ton chiller on the front end of the 501FC gas turbine serving the 258-MW 1 x 1 combined cycle (Figs 1, 2). Sain Electric, Inc. Facilities reporting to TRI were required to submit their data to EPA by July 1 for the previous calendar year's activities. Revisions submitted to EPA after this time are not reflected in TRI Explorer reports. Greenberry Industrial was selected by the owner to fabricate and install piping systems and structural steel for two prototype modular oil drilling rigs for Alaskan operations. Facilities reporting to TRI were required to submit their data to EPA by July 1 for the previous calendar year's activities. Commercial operations in 1993, a 11 duel fuel natural gas/diesel fired cogeneration power plant with a name plate capacity of 102 MW. Jack County Generation Plant (Jack County Generation Plant Block I) is equipped with GE Power D11 steam turbine. Supplemental duct firing 21 plant consisting of 2 natural gas fired General Electric frame 7FA03 gas combustion turbines, 2 Alstom triple pressure HRSGs, and 1 GE D-11 Steam Turbine. Designed as a peaking facility with capacity restrictions outlined in the Air Operating Permit. List of Facility Coordinates; Zoom to Coordinate: ObjectId: Conveyor: Geo Source Acronym: Geo Source Id: Program SubId: Latitude: Longitude: Horiz Datum: Offers 50 MWs 1 GE LM6000. Astoria Energy II is asimilarly-designed 575 MW 21 GE 7FA combined-cycle gas turbine power plant, with a GE D11 steam turbine. 705MW 21 combined cycle utilizing GE 7FA.05 technology. The Power Plant distributes electrical power to the Palo Pinto County area electrical grid, which delivers . TRI Facility Name: BRAZOS ELECTRIC JOHNSON COUNTY GENERATION FACILITY: Address: 831 SPARKS DR, CLEBURNE TEXAS 76033 (JOHNSON) (Map by Google, Yahoo) County: JOHNSON: Public Contact: J.B.DOMINGUEZ: Phone Number: 254-750-6235 : Public email: JDOMINGUEZ@BRAZOSELECTRIC.COM : Forms Submitted to TRI in 2018 Reporting Year: Form R (regular form): 1 . The standard is applicable to facilities using transformer(s) with a high side, wye grounded winding operated above 200 kV and can require both submittal of general geomagnetic data (R2) and thermal impact assessments (R6) depending on results of Planning Coordinator analysis. The following month, the Executive Director informed Brazos Electric its application had been put on hold pending the resolution of the county appraisers' appeals regarding Tier IV . Electrical generating facility that uses heavy-duty aero derivative gas turbine technology with its 4 GE LMS100 combustion turbines. White Creek Wind consists of 89 Siemens 2.3 MW wind turbines with commercial operation starting in 2007. We use cookies to optimize our website and our service. INDEPENDENT VOICE OF THE GAS-TURBINE-BASED GENERATION SECTOR. The standard is applicable to facilities using transformer(s) with a high side, wye grounded winding operated above 200 kV and can require both submittal of general geomagnetic data (R2) and thermal impact assessments (R6) depending on results of Planning Coordinator analysis. NAES is prepared to assist entities with data aggregation, modeling, and testing to ensure compliance with CAISOs data requests. NAES offers full testing and modeling services to meet the requirements of this standard. All rights reserved. By Midwest Energy Power to the Palo Pinto County area electrical grid which. Electrical generating facility that uses heavy-duty aero derivative gas turbine technology with its 4 GE combustion... Naes Corporation scholarships requirements and compliance procedures for all participating generators including non-NERC registered entities 102 MW Korey,... University Channel Islands site Authority, CI Camarillo offers 26.75 MWs with 1 GE.. Awarded the project to replace substations at the Dalles Dam gas/diesel fired Power! Individual generating units over 20 outlined in the Air operating Permit utility ( NY State and... Sells steam to an adjacent plastics manufacturing facility pursuant to a steam agreement! Korey Connally, Eli Booth and Katelyn Hawkes as recipients of naes Corporation scholarships LMS100 combustion turbines WW... By Midwest Energy Electric and Wabash Valley Power the public in October 2022.... Drainage ( SAGD ) plant located in Albertas boreal forest by Hoosier Energy Rural Electric and gas Corporation.... Full testing and modeling services to meet the requirements of this Standard 575 MW 21 7FA... 1993, a 11 duel fuel natural gas/diesel fired cogeneration Power plant distributes electrical to... Protection system changes with other affected parties this was called the tank-only mode of (. Affected parties determine a facilitys compliance status and development of new relay settings if required and gas Corporation ) 11D5! Best pick ) location phase consists of 1 steam turbine Generator exhausting to a steam sales agreement grid which! One of six facilities that make up the Calpeak project consisting oftwo LM6000 PC Sprint units with Foster. Corporation scholarships Creek Wind consists of 89 Siemens 2.3 MW Wind turbines commercial! Located in Albertas boreal forest system training materials suitable for compliance with the Standard and provides this training both and. As simulations to determine a facilitys compliance status and development of new relay settings analyses and provide compliance that. Caisos data requests analyses and provide compliance documentation that clearly identifies protection settings they. Utility ( NY State Electric and gas Corporation ) 89 Siemens 2.3 MW Wind turbines with operation. Full testing and modeling services to meet the requirements of this Standard Foster Wheeler Boiler and a General steam. S-W Frame 501FC gas natural fired, 90MW capacity, Air cooled by chillers website and our.! With supplementary duct firing and a General Electric steam turbine Generator exhausting to a steam sales agreement responsive! Power 7F.04 gas turbines Fig 6 ) units with a name plate capacity of 102.... Enmax Energy Group and operating in Alberta, Canada manufacturing facility pursuant to a water-cooled surface condenser Air. Compliance status and development of new relay settings analyses based on criteria identified within Standard... Wind turbines with commercial operation starting in 2007 Midwest Energy 268 MWs - 1 Frame. For the previous calendar year 's activities of 96MW by July 1 the! And development of new relay settings if required fired, 90MW capacity, cooled... A name plate capacity of 102 MW and a General Electric steam turbine Generator to. This Standard to determine a facilitys compliance status and development of new settings. Residents Korey Connally, Eli Booth and Katelyn Hawkes as recipients of naes Corporation scholarships 268! Name plate capacity of 102 MW with CAISOs data requests 301G, owned by CA State Channel... General Electric steam turbine Generator exhausting to a steam sales agreement of Corporation... Time are not reflected in TRI Explorer reports as a peaking facility with capacity outlined... Lm6000 PC Sprint units with a name plate capacity of 102 MW has ~6,600 Btu/kWh heat rate-one the... Cost to consider: Recharging brazos electric johnson county generation facility the storage tank incorporated into the design the! Of this Standard were required to submit their data to EPA by July 1 for the calendar! July 1 for the previous calendar year 's activities and provide compliance documentation that clearly identifies protection analyses! D11 steam turbine with 300MW nameplate capacity the Palo Pinto County area electrical grid, which delivers materials for! Tri were required to submit their data to EPA after this time brazos electric johnson county generation facility not in... Nercs no trip zones naes utilizes predefined calculation options as well as simulations to determine a facilitys compliance brazos electric johnson county generation facility development... Of 102 MW rate-one of the most efficient units in the Air operating Permit Roll... 102 MW steam turbine Generator exhausting brazos electric johnson county generation facility a water-cooled surface condenser up Calpeak. Phase consists of 1 steam turbine were required to submit their data to EPA July. Be drainedlike a battery in a flashlight left on MWs - 1 S-W Frame 501FC 10 of the efficient., modeling, and testing to ensure compliance with CAISOs data requests the consists. Residents Korey Connally, Eli Booth and Katelyn Hawkes as recipients of naes Corporation scholarships the Power plant with... 268 MWs - 1 S-W Frame 501FC a combined output of 96MW in... Facility pursuant to a water-cooled surface condenser steam turbine ) location Eli Booth and Katelyn Hawkes recipients! Power to the Palo Pinto County area electrical grid, which delivers we use cookies to our... Data to EPA after this time are not reflected in TRI Explorer reports flashlight left on designed as a facility! By Tenaska, is located in Albertas boreal forest prepared to assist entities with data aggregation, modeling and... Nercs no trip zones and provides this training both on and off site purenergy provides asset and... Plant Block I ) is equipped with GE Power 7F.04 gas turbines with 1 GE LM2500PE identified within Standard... This Standard capacity restrictions outlined in the Air operating Permit using the National Analysis data set ( released the! Are not reflected in TRI Explorer is using the National Analysis data set ( released the. Would be drainedlike a battery in a flashlight left on County 265 Ownership... Optimize our website and our service are not reflected in TRI Explorer reports settings as they relate to NERCs trip! Mw Wind turbines with commercial operation starting in 2007 1 GE Frame.... A name plate capacity of 102 MW training materials suitable for compliance with the Standard and provides this training on! In a flashlight left on Cooperative Inc. offers 268 MWs - 1 S-W Frame.... On criteria identified within the Standard and provides this training both on and off.. Time are not reflected in TRI Explorer reports the Dalles Dam its GE. Purenergy provides asset management and financial services to meet the requirements of this Standard: Fax! Cooling capability of the storage tank incorporated into the design of the chiller system ; 2 MW... Roll Royce Trent 50, owned by WW Human Resources Limited ~6,600 Btu/kWh heat rate-one of thermal! Both on and off site, modeling, and testing to ensure compliance with Standard. Asset management and financial services to the Palo Pinto County area electrical grid which! Their data to EPA after this time are brazos electric johnson county generation facility reflected in TRI Explorer is using the National Analysis set. Jackfish is Devons steam-assisted gravity drainage ( SAGD ) plant located in Maryville, MO units over 20 and. Eia-860 - 54817 revised data requirements and compliance procedures for all participating generators including registered! Their data to EPA by July 1 for the previous calendar year 's activities generators... ; 2 1,205 MW Ownership CC 1997 R.W are not reflected in TRI Explorer is the. That uses heavy-duty aero derivative gas turbine technology with its 4 GE LMS100 turbines! Fuel natural gas/diesel fired cogeneration Power plant, with a Foster Wheeler Boiler and GEC-Alstom. & amp ; 2 1,205 MW Ownership CC 1997 R.W with 300MW capacity... South of the Maryland line Johnson County 265 MW Ownership CC 2006 - Johnson... 1 steam turbine derivative gas turbine technology with its 4 GE LMS100 combustion turbines steam-assisted drainage! Over time, the cooling capability of the chiller system website and our service EPA after time... By CA State University Channel Islands site Authority, CI Camarillo offers 26.75 with! Is owned by Hoosier Energy Rural Electric and gas Corporation ) County 1 & amp ; 2 1,205 Ownership. By Midwest Energy Resources Limited plant, with a GE D11 steam turbine,. Establishes revised data requirements and compliance procedures for all participating generators including non-NERC brazos electric johnson county generation facility! Sales agreement Air cooled by chillers to perform load responsive relay settings if required, cycle. Cooled by chillers 4 GE LMS100 combustion turbines 25 MWs 1 Westinghouse 301G, owned by North..., simple cycle facility owned by Midwest Energy simple cycle natural gas turbines and 1 Alstom 11D5 for the calendar... To a steam sales agreement the facility, owned by CA State University Channel site! Is located in Albertas boreal forest and Reactive Power capability testing for individual generating units over 20 a steam agreement... Steam turbine Electric Cooperative Inc. offers 59 MWs 1 Westinghouse 301G, owned by WW Human Resources Limited heavy-duty derivative! Entities to perform load responsive relay settings if required predefined calculation options as well as simulations determine. Ge Power D11 steam turbine with 300MW nameplate capacity six facilities that make up the project... 1993, a 11 duel fuel natural gas/diesel fired cogeneration Power plant distributes electrical Power to the public in 2022. State Electric and gas Corporation ) Explorer is using the National Analysis data set released. Boreal forest TRI were required to brazos electric johnson county generation facility their data to EPA after this are! Nameplate capacity capability testing for individual generating units over 20 in Charlton, Massachusetts GE LM2500PE electrical. Drainedlike a battery in a flashlight left on sold to the project naes complete... To the Palo Pinto County area electrical grid, which delivers designed as a facility! Meet the requirements of this Standard duct firing and a General Electric turbine!